The Grove School

BMS System Installed: SIEMENS PX
Commenced: 2015
Comments: Siemens PX system controls the main HVAC plant. DACS provides assistance in on going service and maintenance of the BMS, additions, modifications upgrading.
St Bartholomews, Newbury.

BMS System Installed: SIEMENS PX
Commenced: 2010
Comments: Siemens PX system controls the main HVAC plant. DACS (Formally CSS) provides all software and graphics engineering for the project, Metering integration, both Modbus (electric meters) and MBus (heat meters). And provided on site commissioning assistance prior to handover.
St Pauls School

BMS System Installed: SIEMENS PX
Commenced: 2015
Comments: Siemens PX system controls the main HVAC plant. DACS provides assistance in on going service and maintenance of the BMS, additions, modifications upgrading.
St Peters the apostle School

BMS System Installed: SIEMENS PX
Commenced: 2009
Comments: Siemens PX system controls the main HVAC plant with integrations to a number of subsystems. DACS (formally CSS) provided Desigo Insight graphics engineering, and assisted in the final commissioning and handover of the system via a remote connection.
Winifred Holtby Academy & Tweendykes School

BMS System Installed: SIEMENS PX
Commenced: 2011
Comments: Siemens PX system controls the main HVAC plant. DACS (Formally CSS) provides assistance in engineering the Green Building Monitoring system, Metering integration, both Modbus (electric meters) and MBus (heat meters). Re-engineering of the Biomass boiler controls, and re-engineering of the Desigo Graphics to allow the BMS to be finally handed over.